Highlighting erodible areas.

Attachments

    Highlighting erodible areas.

    The installation of a PV farm requires both an erosion and flood risk assessment. The 330 Ha area was modeled using a hydrograph to represent small channels and streams and a hyetograph to model rainfall over the entire area.
    The modeling of the flow velocities of this project highlight the zones sensitive to erosion for a given period of return.