Category

Videos
GEOINTEC has clinched over 20 studies for solar PV projects in the Nordic countries last year 2023! Navigating these projects involves delving into unique soil compositions — think peat bogs, glacio-fluvial sediments and moraines — each presenting its own set of challenges and opportunities.Our involvement spans geotechnical studies, flooding risk assessment, land surveys employing LiDAR...
After having participated in more than 10 solar PV projects in Australia, Geointec has opened a new subsidiary in SIDNEY in order to offer our services related to ground engineering
Thanks to all! Thank you very much to all the visitors of our Booth in GENERA 22, it has been a great opportunity to share with all of you #GEOINTEC #GENERA #SolarProjects #PVprojects #Geotechnicalsurveys #RenewableEnergy #POT
The installation of a PV farm requires both an erosion and flood risk assessment. The 330 Ha area was modeled using a hydrograph to represent small channels and streams and a hyetograph to model rainfall over the entire area. The modeling of the flow velocities of this project highlight the zones sensitive to erosion for...
In this project, the study area for a PV plant was located downstream a dam. The numerical modelling of this dam in the worst situation, when the spillway is full, was necessary to check the impact on the studied area. In order to do this, a model based on hydrographs and composed of mesh with...
At Geointec, we are specialists in ramming, traction and lateral load tests for single-axis solar monitoring and fixed solar structures. We design the protocols necessary to perform these tests. We pre-design the foundation as well as its final design thanks to the statistical processing of the results obtained during our test campaigns.
What makes this 2D model interesting is the fact that the construction of the plant is taken into account in the calculations. The influence of the roads and civil works is studied, with the completion of the earthworks for the transformer stations. Geointec offers modeling before and after plant commissioning to verify expected water levels...
1 2