Day

March 13, 2017
GEOINTEC accomplishes the study of Contaminated Soils and Hazardous Substances for 2 photovoltaic projects of 50 MW each one, located in northern Jordan, where GEOINTEC had previously carried out geotechnical studies for the construction stage. The study took place last December 2016 on a research area of 277 ha. Such studies are especially recommended in...
GEOINTEC has established in Mexico like an expert in risk analysis to the ground in solar PV plants, totaling an equivalent power of nearly 1.3 GW, and accounting for 36% of the Projects awarded in the First and Second Energy auction 2016 in Mexico, in which 28 Projects were awarded totaling 3.62 GW of power...