At Geointec, we are specialists in ramming, traction and lateral load tests for single-axis solar monitoring and fixed solar structures. We design the protocols necessary to perform these tests. We pre-design the foundation as well as its final design thanks to the statistical processing of the results obtained during our test campaigns.
What makes this 2D model interesting is the fact that the construction of the plant is taken into account in the calculations. The influence of the roads and civil works is studied, with the completion of the earthworks for the transformer stations. Geointec offers modeling before and after plant commissioning to verify expected water levels...
Pull Test for a Solar PV Plant in the Pyrenees, with the first snowfalls during week W45.
In eminently flat areas without rivers or canals, hydrological problems can arise in photovoltaic parks. The combination of intense rain and the impact of infrastructure on the land’s natural drainage network can cause significant flooding and areas of severe erosion. For this reason, hydrological and hydraulic studies are necessary to reduce the risks by optimizing...
Geointec offers a suite of services in France, which include GEO + HYDRO + TOPO studies for project developers, pre-design studies for foundations + pull test + final design, for structural companies, as well as customized solutions for EPC.
The Geointec-France team has participated in more than 10 solar photovoltaic projects in France, Spain, Greece and Portugal, and in countries on other continents such as Chile and Mozambique.
Small Means of Distributed Generation projects are projects of less than or equal to 9MW of power that are connected to a medium voltage network
With the new subsidiary in Lyon (France), we will contribute our experience of + 23GW to the development of the renewable market in Western Europe.
Geointec has carried out soil studies in five photovoltaic solar plants. The set of projects, that will be built in the provinces of Seville and Córdoba in Spain, will have a power of 250 MW.