GEOINTEC has succesfully conducted a Pull-Out Test (POT) campaign across five photovoltaic (PV) projects in Ireland, spanning Leinster, Connacht, and Munster
The engineering and geotechnical survey phase has been completed on two solar parks with over 250 hectares in England.During these surveys, more than 140 test points were examined regarding soil mechanics, accompanied by geophysical and laboratory testing. The intervention was carried out by GEOINTEC’s technical team in the span of two weeks, focused on gathering...
🌍 🇮🇪 GEOINTEC reaffirms its commitment to solar engineering by leading the Pull Out Test (POT) in five projects in Ireland, located in the provinces of Leinster, Connacht and Munster.The campaign consists of POT and Execution engineering to verify the performance of the solar tracker against the ground’s bearing capacity in each of the five...
Geointec has carried out two geotechnical studies for a solar photovoltaic farm in the province of Imbabura, Ecuador, with a total area of 400 hectares.
Geointec has carried out soil studies in five photovoltaic solar plants. The set of projects, that will be built in the provinces of Seville and Córdoba in Spain, will have a power of 250 MW.
A Geointec team moved to the south of the Atacama Desert, in the Antofagasta region of Chile, to conduct the Geotechnical Studies for the construction of a photovoltaic solar plant that will have a nominal power of about 200 MW.