The engineering and geotechnical survey phase has been completed on two solar parks with over 250 hectares in England.During these surveys, more than 140 test points were examined regarding soil mechanics, accompanied by geophysical and laboratory testing. The intervention was carried out by GEOINTEC’s technical team in the span of two weeks, focused on gathering...
🌍 🇮🇪 GEOINTEC reaffirms its commitment to solar engineering by leading the Pull Out Test (POT) in five projects in Ireland, located in the provinces of Leinster, Connacht and Munster.The campaign consists of POT and Execution engineering to verify the performance of the solar tracker against the ground’s bearing capacity in each of the five...
Geointec has carried out two geotechnical studies for a solar photovoltaic farm in the province of Imbabura, Ecuador, with a total area of 400 hectares.
Geointec has carried out soil studies in five photovoltaic solar plants. The set of projects, that will be built in the provinces of Seville and Córdoba in Spain, will have a power of 250 MW.
We started the year taking stock of the projects carried out, and we emphasize that only in the Iberian Peninsula Geointec has carried out more than twenty geotechnical studies for renewable energy projects, which affirms the increase in the production of green energy in the country.
The retrospective study or "Back Analysis" is an effective method that allows to analyze the resistance of the land and to obtain, using the results from the load tests or "Pull Out Tests”, certain geotechnical parameters of the selected area for the construction.